As a benefit, in most cases our wastewater technology sludge degradation process removes a great majority of the phosphorus and most if not all of the ammonia that is tied up in the sludge in your system.
This takes place as it goes through our degrading process.
With our patented G3 Technology, your system will start to gain capacity as soon as we begin our process. Every project starts with an onsite survey, a drone flyover and lagoon sonar mapping when possible. We will then collect samples of your sludge where we can run extensive tests to determine at what level of our process your system needs.
The total capacity of bio-solids in your system are decreased as they are degraded. As this happens, the water that is tied up in the solids is released. This makes the water in the lagoon ready to be released through your normal permitted process or other process we have available.
Do not be troubled with the astronomical cost and long timelines of dredging and hauling sludge. Our process takes place quickly, on site, and in real timeline.